Sign in Subscribe

Upton Conservation Approves Peppercorn Hill Boardwalk Project

Conservation Commission · Meeting of March 25, 2026

Upton Conservation Commission approves environmental applications with conditions. The board unanimously approved a 96-foot boardwalk at Peppercorn Hill Conservation Area for an Eagle Scout project, narrowing the design to two feet to mitigate wetland impact after state Department of Environmental Protection review; approved a stormwater permit for new construction at 15 Kiwanis Beach Road with required silt fence and raingarden; and issued a Negative Determination for a deck at 56 Shore Drive on Taft Pond with conditions requiring a five-foot native shrub buffer and cleanup of materials. Conservation Administrator Mary Overholt directed the boardwalk design strategy.

The Commission also authorized $1,500 to delineate property lines on the Robertson Family Conservation Restriction trail to enable possible trail relocation.

In the full story:

  • The complete report — 334 words

Source: the Conservation Commission meeting of March 25, 2026, reported from the official video recording and transcript.

Keep reading with a 14-day free trial

Subscribe to Upton News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Upton News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe